Home

Study Map Schedule Contacts
Need & Objective Documents Study Details Public Involvement
 

 

 

 

 

 

 

 

STUDY DETAILS

The first major work effort in the RCA process is the collection of available data pertaining to the study corridor. Once the data collection was completed and the needs of the corridor determined, the County develops and evaluats the benefits and impacts of a number of alternative improvement concepts for CR 19A.  Based on this analysis and public input gained throughout the project and during the Alternatives Public Meetings, a single Preferred Alternative is selected. Ultimately, the County will provide Location Design Concept Acceptance of the recommended project.

 

STUDY DOCUMENTS

Once completed study documents will be linked as downloadable PDF files.

Draft Preliminary Engineering Report
Conceptual Design
Draft Typical Sections
Public Involvement Plan
Noise Study Report
Air Quality Screening and Technical Report
Contamination Screening Evaluation Report
Wetland Technical Memorandum
Water Quality Impact Evaluation

Pond Siting Report

Public Hearing Minutes

Comments and Coordination Package